Casestudies

Latitude

In late 2015 our long term client, GE Money, had an interesting challenge for us. After selling their ‘money’ business, their senior management group decided on a brand design for what is now renamed Latitude Financial Services. The new branding was released with a focus on internal staff, and a strong emphasis on change management. This release happened simultaneously in four head offices spread over three states and two countries over one weekend, and was labelled ‘Celebration Day’. They came to us to design, produce, and roll-out all the associated signage and celebratory paraphernalia.

Challenges that came with a project of this magnitude and time restraints included:

  • Providing budget estimates for the signage and launch concept before, during and after they were conceived
  • Live consultation on the feasibility and buildability of design concepts
  • Ensuring we had the right prequalified contractors on notice to guarantee we had a 100% launch success
  • Ensuring we also had accredited and proven installation teams ready to place and install all of the signage collateral across all sites
  • Providing unit costs for standard and bespoke elements such as balloons, internal graphic treatments, mobile photographic backdrops and atrium sails
  • Ensuring we could create, manufacture and coordinate all of the components for all sites within ten working days

The outcome was a 100% successful launch of Celebration Day, across all sites. This included everything from lift lobby graphic treatments to entry floor, wall, lift and glazing graphics being in place. A high level of communication and synergy between our client’s project team, SignManager and our contractor network made this risky project one to look back on with pride.

Challenges that came with a project of this magnitude and time restraints included:

  • Providing budget estimates for the signage and launch concept before, during and after they were conceived
  • Live consultation on the feasibility and buildability of design concepts
  • Ensuring we had the right prequalified contractors on notice to guarantee we had a 100% launch success
  • Ensuring we also had accredited and proven installation teams ready to place and install all of the signage collateral across all sites
  • Providing unit costs for standard and bespoke elements such as balloons, internal graphic treatments, mobile photographic backdrops and atrium sails
  • Ensuring we could create, manufacture and coordinate all of the components for all sites within ten working days

The outcome was a 100% successful launch of Celebration Day, across all sites. This included everything from lift lobby graphic treatments to entry floor, wall, lift and glazing graphics being in place. A high level of communication and synergy between our client’s project team, SignManager and our contractor network made this risky project one to look back on with pride.

Leave a Reply

Your email address will not be published. Required fields are marked *

Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from Youtube
Vimeo
Consent to display content from Vimeo
Google Maps
Consent to display content from Google
Spotify
Consent to display content from Spotify
Sound Cloud
Consent to display content from Sound